IBC Chapter 17 Structural Special Inspection, Concrete Cylinder & CWI Weld Affidavit
Standard / Reference: 2021 IBC Chapter 17 § 1704 · ASTM C39 Concrete Compression · AWS D1.1 Structural Welding Code
Why professionals use this template: 6,800/mo search demand: commercial builders and special inspection labs needing IBC § 1704 final compliance affidavits combining 28-day concrete breaks and AWS D1.1 ultrasonic weld logs.
144-DPI VECTOR PREVIEW · PAGE 1 OF 1
ACROFORM READY
Included Financial Metrics & Line-Item Schedule
Target Roles: Special Inspectors (SI), Structural Engineers of Record (SER), Testing Labs & Building Officials · Search Keywords: ibc chapter 17 special inspection final report and compliance affidavit pdf, astm c39 concrete cylinder 28 day break log, aws d1.1 structural steel weld inspection report, post tensioned slab elongation inspection
CONCRETE CYLINDERS TESTED
48 Cylinders (Spec: 4,000 PSI)
28-DAY MEAN COMPRESSIVE
4,680 PSI (117% of f'c)
AWS D1.1 ULTRASONIC WELDS
100% Pass (0 Rejects)
HIGH-STRENGTH BOLT TORQUE
A325 Turn-of-Nut Verified
| CODE | DESCRIPTION & TECHNICAL SPECIFICATION | BASIS / QTY | AMOUNT / DELTA |
|---|---|---|---|
| SI-CONC | IBC § 1705.3 Continuous Inspection of Reinforcing Steel Placement, Anchor Bolts & 12 Concrete Pours | 1,420 Cu Yds Placed | $6,600.00 |
| LAB-C39 | ASTM C39 7-Day & 28-Day Cylinder Compression Breaks (Min: 4,310 PSI · Max: 5,040 PSI) | 48 Lab Cylinders | $2,880.00 |
| SI-WELD | IBC § 1705.2 AWS D1.1 Certified Welding Inspector (CWI) Ultrasonic NDT on Moment Connections | 64 Moment Joints | $5,720.00 |
| AFF-1704 | Final Statement of Special Inspections Sealed by Registered Design Professional for C of O | Certificate of Occ | $3,000.00 |
Related Inspection, Appraisal & Clean Energy Templates
- #41 — Residential Home Inspection Defect Summary & Buyer Repair Request Addendum (ASHI / InterNACHI Standards of Practice · Buyer Inspection Contingency Resolution)
- #42 — Solar PV + LFP Battery Storage Engineering Proposal & 25-Year Cash-Flow Schedule (NEC Article 690 / 706 · NREL PVWatts® v8 Production Model · IRC § 25D / § 48E Credit)
- #43 — USPAP Restricted Real Estate Appraisal & Sales Comparison Adjustment Grid (2024–2026 USPAP Standards Rule 2-2(b) · Mandatory SR 2-3 Appraiser Certification)
- #44 — Phase I Environmental Site Assessment (ASTM E1527-21) Executive REC Summary (ASTM E1527-21 Standard · 40 C.F.R. Part 312 (CERCLA Innocent Landowner AAI Defense))
- #45 — ALTA/NSPS Land Title Boundary Survey Certification, Zoning & Table A Schedule (2021 ALTA/NSPS Minimum Standard Detail Requirements · Relative Positional Precision < 0.07 ft)
- #56 — AIA B101-Style Standard Form of Architect Agreement & 5-Phase Design Fee Schedule (AIA Document B101 Standard · NCARB Rules of Conduct · 17 U.S.C. § 120 Architectural Works)
- #57 — Geotechnical Engineering Subsurface Soil Boring Log & Foundation Bearing Report (ASTM D1586 (SPT Blow Counts) · ASTM D2487 (USCS Soil Class) · 2021 IBC Chapter 18 § 1803)
- #58 — Civil Engineering Stormwater Hydrology, TR-55 Runoff & Detention Basin SWPPP Study (Clean Water Act § 402 NPDES · USDA NRCS TR-55 Method · Municipal MS4 Stormwater Ordinance)
- #59 — Utility-Scale Commercial Solar Interconnection Application & Stamped 3-Line Diagram Packet (IEEE 1547-2018 Standard · UL 1741-SB Smart Inverter Cert · NEC Article 705 Interconnected Systems)