CONCEPT #41 OF 100 · Inspection, Appraisal & Clean Energy · LAYOUT: inspection_checklist
Residential Home Inspection Defect Summary & Buyer Repair Request Addendum
Standard / Reference: ASHI / InterNACHI Standards of Practice · Buyer Inspection Contingency Resolution
Why professionals use this template: Homebuyers, Realtors, and inspectors needing a concise 1-page Executive Defect & Cost-to-Cure Matrix extracted from 70-page inspection PDFs to negotiate seller closing credits.
144-DPI VECTOR PREVIEW · PAGE 1 OF 1
ACROFORM READY
Included Financial Metrics & Line-Item Schedule
Target Roles: Licensed Home Inspectors (ASHI/InterNACHI), Buyer's Agents & Structural Inspectors · Search Keywords: home inspection summary report and repair request addendum template pdf, ashi internachi inspection defect summary, real estate repair credit vs seller repair worksheet, safety hazard inspection report
SYSTEMS INSPECTED
10 Core Systems (2,840 SF)
MAJOR / SAFETY DEFECTS
4 Priority Action Items
ESTIMATED COST TO CURE
$7,450.00 – $8,900.00
REQUESTED SELLER CREDIT
$7,800.00 AT CLOSING
| CODE | DESCRIPTION & TECHNICAL SPECIFICATION | BASIS / QTY | AMOUNT / DELTA |
|---|---|---|---|
| DEF-ELEC | [SAFETY] Federal Pacific (FPE) Stab-Lok Sub-Panel in Garage: Known Breaker Trip Failure Hazard | Master Elec Quote | $2,650.00 |
| DEF-ROOF | [MAJOR] Active Flashing Leak at Chimney Cricket & 6 Cracked Pipe Boots on Rear Slope | Licensed Roofer | $1,850.00 |
| DEF-CRAWL | [STRUCT] Elevated Crawlspace Moisture (22% Wood MC) + Torn Vapor Barrier & Rim Joist Fungus | Crawl Encapsulation | $2,450.00 |
| DEF-HVAC | [MAINT] Primary Water Heater (2011 Date Code) Missing TPR Discharge Pipe & Expansion Tank | Licensed Plumber | $850.00 |
Related Inspection, Appraisal & Clean Energy Templates
- #42 — Solar PV + LFP Battery Storage Engineering Proposal & 25-Year Cash-Flow Schedule (NEC Article 690 / 706 · NREL PVWatts® v8 Production Model · IRC § 25D / § 48E Credit)
- #43 — USPAP Restricted Real Estate Appraisal & Sales Comparison Adjustment Grid (2024–2026 USPAP Standards Rule 2-2(b) · Mandatory SR 2-3 Appraiser Certification)
- #44 — Phase I Environmental Site Assessment (ASTM E1527-21) Executive REC Summary (ASTM E1527-21 Standard · 40 C.F.R. Part 312 (CERCLA Innocent Landowner AAI Defense))
- #45 — ALTA/NSPS Land Title Boundary Survey Certification, Zoning & Table A Schedule (2021 ALTA/NSPS Minimum Standard Detail Requirements · Relative Positional Precision < 0.07 ft)
- #56 — AIA B101-Style Standard Form of Architect Agreement & 5-Phase Design Fee Schedule (AIA Document B101 Standard · NCARB Rules of Conduct · 17 U.S.C. § 120 Architectural Works)
- #57 — Geotechnical Engineering Subsurface Soil Boring Log & Foundation Bearing Report (ASTM D1586 (SPT Blow Counts) · ASTM D2487 (USCS Soil Class) · 2021 IBC Chapter 18 § 1803)
- #58 — Civil Engineering Stormwater Hydrology, TR-55 Runoff & Detention Basin SWPPP Study (Clean Water Act § 402 NPDES · USDA NRCS TR-55 Method · Municipal MS4 Stormwater Ordinance)
- #59 — Utility-Scale Commercial Solar Interconnection Application & Stamped 3-Line Diagram Packet (IEEE 1547-2018 Standard · UL 1741-SB Smart Inverter Cert · NEC Article 705 Interconnected Systems)
- #60 — IBC Chapter 17 Structural Special Inspection, Concrete Cylinder & CWI Weld Affidavit (2021 IBC Chapter 17 § 1704 · ASTM C39 Concrete Compression · AWS D1.1 Structural Welding Code)