← ALL 100 DOCUMENT TEMPLATES DOWNLOAD FILLABLE PDF ↗
Inspection, Appraisal & Clean Energy certification seal
CONCEPT #58 OF 100 · Inspection, Appraisal & Clean Energy · LAYOUT: inspection_checklist

Civil Engineering Stormwater Hydrology, TR-55 Runoff & Detention Basin SWPPP Study

Standard / Reference: Clean Water Act § 402 NPDES · USDA NRCS TR-55 Method · Municipal MS4 Stormwater Ordinance

Why professionals use this template: 8,900/mo search demand: civil engineers and site developers needing pre- vs. post-development peak discharge tables (2-yr, 10-yr, 25-yr, 100-yr) to obtain land disturbance permits.

Customize Layout & Elements Live

Download Fillable PDF ↗
144-DPI VECTOR PREVIEW · PAGE 1 OF 1 ACROFORM READY
Civil Engineering Stormwater Hydrology, TR-55 Runoff & Detention Basin SWPPP Study preview

Included Financial Metrics & Line-Item Schedule

Target Roles: Professional Civil Engineers (PE), Land Developers & Municipal Stormwater Reviewers · Search Keywords: stormwater drainage report and detention pond calculation template pdf, tr 55 pre vs post development runoff study, npdes construction swppp inspection checklist, 100 year storm weir routing report

PRE-DEV 25-YR PEAK FLOW
28.4 CFS Baseline
POST-DEV ROUTED 25-YR
21.6 CFS (-23.9% Peak)
DETENTION BASIN VOLUME
2.45 Acre-Feet Storage
WATER QUALITY 80% TSS
First 1.2" Rain Captured
CODE DESCRIPTION & TECHNICAL SPECIFICATION BASIS / QTY AMOUNT / DELTA
HYD-TR55NRCS TR-55 & HydroCAD Watershed Routing (2, 10, 25 & 100-Year 24-Hr Type II Storm Events)14.8-Acre Basin$5,800.00
BAS-WEIRMulti-Stage Concrete Outlet Control Structure (6" WQ Orifice + 18" Culvert + Broad-Crested Weir)1.5' Freeboard$6,400.00
NPD-SWPNPDES Construction General Permit (CGP) Notice of Intent (NOI) & 3-Phase Erosion Control SWPPPTDEC Permit$4,200.00
MS4-COVLong-Term Detention Basin Maintenance Covenant & As-Built Stage-Storage CertificationRecorded Covenant$3,000.00

Related Inspection, Appraisal & Clean Energy Templates