CONCEPT #63 OF 100 · Logistics, Fleet & Manufacturing · LAYOUT: executive_draw_ledger
BIMCO SUPPLYTIME-Style Marine Vessel Time Charter Party & Bunker Fuel Survey Log
Standard / Reference: 46 U.S.C. § 55102 (Jones Act Coastwise) · MARPOL Annex VI (<0.10% S MGO) · BIMCO Standard
Why professionals use this template: 7,300/mo search demand: commercial tug, barge, and offshore vessel operators needing clear daily hire rates, on-hire/off-hire bunker fuel inventories, and knock-for-knock indemnity schedules.
144-DPI VECTOR PREVIEW · PAGE 1 OF 1
ACROFORM READY
Included Financial Metrics & Line-Item Schedule
Target Roles: Commercial Tug/Barge Operators, Offshore Supply Vessel (OSV) Owners & Maritime Charterers · Search Keywords: marine vessel time charter party agreement and bunker survey log pdf, bimco supplytime charter party worksheet, on hire off hire bunker fuel delivery note, jones act coastwise vessel charter
DAILY CHARTER HIRE RATE
$4,950.00 / DAY
FIRM CHARTER DURATION
30 Days (+15d Option)
ON-HIRE MGO BUNKER ROB
42.5 MT @ $820/MT
TOTAL 30-DAY COMMITMENT
$195,850.00
| CODE | DESCRIPTION & TECHNICAL SPECIFICATION | BASIS / QTY | AMOUNT / DELTA |
|---|---|---|---|
| HIRE-30 | 30-Day Time Charter: Twin-Screw 3,200 HP Ocean Tug M/V "Titan Resolve" (USCG Subchapter M Cert) | 30 Days @ $4,950 | $148,500.00 |
| BNK-ON | On-Hire Remaining-on-Board (ROB) Ultra-Low-Sulfur Marine Gas Oil (ISO 8217 DMA · 42.5 Metric Tons) | 42.5 MT @ $820/MT | $34,850.00 |
| MOB-4CH | Lump-Sum Mobilization / Demobilization Transit Between Port Fourchon Berth C-4 and Operating Site | Round-Trip Mob | $12,500.00 |
| CRW-USCG | Full 24-Hr USCG Licensed Master, Chief Engineer & 4 Able Seamen + P&I Club ($50M) Coverage | Included in Hire | $0.00 |
Related Logistics, Fleet & Manufacturing Templates
- #36 — Uniform Straight Bill of Lading (BOL) & Freight Broker Load Rate Confirmation (49 U.S.C. § 14706 (Carmack Amendment) · Uniform Straight BOL · Section 7 Non-Recourse)
- #37 — Automotive & Heavy-Duty Fleet Repair Order (RO) + Multi-Point Diagnostic Invoice (T.C.A. § 66-19-101 Garagekeeper's Lien Notice · 49 C.F.R. § 396.17 DOT Inspection Standard)
- #38 — Precision CNC Machining Quote, BOM Tier Matrix & AS9102 First Article Summary (ISO 9001:2015 / AS9102 Rev C First Article · ASME Y14.5 GD&T · DFARS 252.225-7009)
- #39 — Heavy Equipment & Construction Machinery Rental Agreement + Hour-Meter Log (UCC Article 2A Commercial Equipment Lease · 160-Hr Monthly Shift Cap · Loss Payee COI)
- #40 — International Commercial Invoice, Packing List & USMCA / HS Tariff Schedule (19 C.F.R. § 141.86 Customs Invoice Contents · Incoterms® 2020 · USMCA Origin Certification)
- #61 — FAA Part 91/135 Aircraft Maintenance Logbook Entry & IA Annual Return-to-Service (14 C.F.R. § 43.9 & § 43.11 · 14 C.F.R. § 91.409 Annual Inspection · FAA Order 8900.1)
- #62 — Marine Vessel Condition & Valuation (C&V) Survey & Ultrasonic Hull Thickness Report (USCG 46 C.F.R. Safety Standards · ABYC E-11 AC/DC Electrical · SAMS / NAMS Survey Standard)
- #64 — OSHA 1926.1432 Critical Crane Lift Plan, Rigging Geometry & Outrigger Bearing Study (OSHA 29 C.F.R. § 1926.1432 · ASME B30.5 Mobile Cranes · ASME B30.9 Slings & Rigging)
- #65 — Heavy Civil Earthmoving Equipment 500-Hour PM, Undercarriage Ultrasonic & Oil SOS Report (MSHA 30 C.F.R. Part 56 Machinery Safety · ISO 3471 ROPS / ISO 3449 FOPS · OEM CTS Standard)
- #89 — Commercial Fleet Master Lease Agreement (Open-End TRAC) & Upfit Amortization (26 U.S.C. § 7701(h) (Qualified Motor Vehicle TRAC Lease) · UCC Article 2A Commercial Leases)